Türk inşaat sektöründe proje yönetimi ve bilgisayar destekli planlama ile verimlilik analizi


Thesis Type: Postgraduate

Institution Of The Thesis: Yildiz Technical University, Faculty of Civil Engineering, Civil Engineering Department, Turkey

Approval Date: 2010

Thesis Language: Turkish

Student: İlknur Dalyan

Principal Supervisor (For Co-Supervisor Theses): Sema Alacalı

Co-Supervisor: Erdoğan Yılmaz