USF-CUTR I-4 FRAME Project “Before” Study: Data Collection and Analysis of Safety and Mobility Conditions Prior to Implementation
Diğer Ülkelerdeki Kamu Kurumları Tarafından Desteklenmiş Proje, 2021 - 2022
- Proje Türü: Diğer Ülkelerdeki Kamu Kurumları Tarafından Desteklenmiş Proje
- Başlama Tarihi: Ocak 2021
- Bitiş Tarihi: Kasım 2022
Proje Özeti
The Florida Department of Transportation (FDOT) created the Interstate 4 (I-4) Florida’s Regional Advanced Mobility Elements (FRAME) project to address safety and mobility issues on I-4 between Tampa and Orlando. The I-4 FRAME project aims to deploy an advanced integrated corridor management system consisting of advanced next-generation technologies. As part of U.S. Department of Transportation (USDOT) Advanced Transportation and Congestion Management Technologies Deployment (ATCMTD) grant obligations, FDOT will conduct a before-after analysis of the emerging technologies. The Center for Urban Transportation Research (CUTR) is one of the universities participating in the before-after evaluation of the project. In this USF-CUTR I-4 FRAME project “before” study, the research team successfully achieved the project objectives and associated tasks: (1) identified mobility challenges on the project corridor and documented how the I-4 FRAME project is addressing the goals set out by FDOT, (2) conducted “before” data collection and data analysis on 15 selected transportation systems and services, (3) developed methodologies for evaluating the safety and mobility performance and benefits of the I-4 FRAME project, (4) studied On-Board Unit (OBU) technology and compared various aspects of both dedicated short-range communication (DSRC) and Cellular Vehicle-To-Everything (C-V2X) On-Board Units (OBUs), (5) performed a comparative study on various use cases of FL511 application and deployed OBUs, and (6) assisted FDOT in developing a Data Management Plan (DMP) and a Project Evaluation Plan (PEP) for the I-4 FRAME project to submit to the Federal Highway Administration (FHWA). This report includes a summary of results and findings from all tasks performed for Phase 1 of the project, which includes data collection and analysis for the “before” period of the project. |