Ders Notu 1
Dear all, you can find the documents mentioned in the orientation lecture.
Please supply your materials until next week.
Update I:
I have mentioned in the orientation but forgat to add alligator cables in to material list. It is added, you can find the revised document as "KOM2742_ListOfMaterials_v1".
Update II:
Figure 4 of the "General Information and Laboratory Equipment" document is updated.
Deney Föyü 10
The experiment sheet 10 is attached.
You are not required to perform theoretical calculation.
Complete the simulation and fill in the table.
Do not forget to add your simulation pictures.
You must use Proteus or LtSpice to simulate the circuits.
Pre-report due date: 01.06.2026, 10:30.
Experiment date: 01.06.2026.
The experiment sheet 9 is attached.
You are not required to perform theoretical calculation.
Only complete the simulation and fill in the table.
You can record the Vpp values of the output signals in a table.
You must use Proteus to simulate the circuits. You can use ideal Opamp.
You don't need to send your simulatiıon files.
Pre-report due date: 11.05.2026, 10:30.
Experiment date: 11.05.2026.
The experiment sheet 8 is attached.
You are not required to perform theoretical calculation.
Only complete the simulation and fill in the table.
You can record the Vpp values of the output signals.
You must use Proteus or Ltspice to simulate the circuits.
Pre-report due date: 04.05.2026, 10:30.
Experiment date: 04.05.2026.
The experiment sheet 7 is attached.
Please bring at least 6 alligator cables (3 pairs).
You must use Proteus or Ltspice to simulate the circuits.
Pre-report due date: 27.04.2026, 10:30.
Experiment date: 27.04.2026.
The experiment sheet 6 is attached.
You must use Proteus or Ltspice to simulate the circuits.
The theoretical solutions should be done using Thevenin theorem.
Pre-report due date: 20.04.2026, 10:30.
Experiment date: 20.04.2026.
The experiment sheet 5 is attached.
You must use Proteus or Ltspice to simulate the circuits.
The theoretical solutions should be done using superposition theorem.
Pre-report due date: 06.04.2026, 10:30.
Experiment date: 06.04.2026.
The experiment sheet 4 and a helper document is attached.
You must use Proteus or Ltspice to simulate the circuits. (If you use Ltspice, select the transient simulation mode to obtain graphes.)
The pre-report should include only the screenshots of the Part 2 circuits and their corresponding output signals. You don't need to do any theoretical calculation or fill ayn table.
Pre-report due date: 30.03.2026, 10:30.
Experiment date: 30.03.2026.
The experiment sheet is attached.
You must use thinkercad to simulate the circuits. Please send your .brd files or circuit links. If you have any questions please do not hesitate to contact me.
You have to use node analysis method for theoretical solution.
Pre-report due date: Monday 10.30 (for GR1&GR2)
The experiment sheet is attached.
You must use thinkercad to simulate the circuits. Please send your .brd files or circuit links. If you have any questions please do not hesitate to contact me.
Pre-report due date: Monday 10.30 (for GR1&GR2)
Send your files to: ckoc@yildiz.edu.tr
The experiment sheet is attached.
You are required to complete a pre-report only for Exp1 Part B. You must use thinkercad to simulate the circuits. If you have any questions please do not hesitate to contact me.
Pre-report due date: Monday 10.30 (for GR1&GR2)
Send your files to: ckoc@yildiz.edu.tr
Update I:
Refinement made for Part A and 3rd circuit is updated.
Duyuru 5
Dear all, experiment dates are determined as below:
Exp10: 01.06.2026
Makeup experiment: 08.06.2026.
There will be no class on 18.05.2026.
Students who want to attend the makeup experiment should send an email explaining their situation and excuse, even if we have already discussed it before.
Hello everyone, you can access the the midterm and lab grades from the links below.
There will be no class right after the Eid Al-Fitr holiday (ramazan bayramı) i.e. no class at 23.03.2026.
Dear all,
Attached you can find the team list with numbers. If any problem, please send an e-mail.
See you!
Dear all, you can find the pre-report template attached. You will use this template for all experiments.
Update v1:
small revisions made for the figure and table names.