World Congress on Engineering (WCE 2011), London, Canada, 6 - 08 July 2011, pp.1190-1193
This study investigates parallel machine scheduling problem in order to minimize total tardiness and we developed a genetic algorithm solution procedure for such problems. Also, using problem specific knowledge, an efficient solution improvement scheme and an appropriate crossover operator are developed and integrated into the genetic algorithm.